GOES-15 Imager Calibration Issues
The Sensor Processing Subsystem (SPS) for GOES-15 (operational as GOES-West) was changed at 20:45 UTC on March 12, 2012. This change that should have been transparent to the users introduced an error to the calibrated data that was especially apparent in the Imager Water Vapor Channel (Channel 3). The SPS... Read More