-----------------------
IHOP AERI-bago Daily Summary
-----------------------
Date: 4 June 2002 CST (Tuesday)
Location: UW-Madison CIMSS/SSEC
Operator: W. Feltz
Weather Conditions:
Bore indicated by U Mass FMCW just prior to frontal passage between 11
and 12 UTC.
http://www.joss.ucar.edu/ihop/catalog/report/mission_scientist/20020604/report.mission_scientist.200206041000.summary.image5.gif
The nighttime was primarily clear. After 12 UTC, winds turned
northeasterly, extensive low clouds, light rain and cool.
Instrument Status:
Stirling cooler is behaving itself and the AERI data looks good. Power
fluctuation at Homestead site caused the Bago surface station to fail at
18 UTC. No surface station data for the rest of the day.
http://scooby.ssec.wisc.edu/AERI-BAGO
Science:
Bore needs to be analyzed from this morning. CI mission was cancelled
and the site was socked in due to low clouds and precipitation.
http://cimss.ssec.wisc.edu/ihop/aeribago/
http://www.joss.ucar.edu/cgi-bin/catalog/ihop/research/index
Miscellaneous:
AERIbago is running unattended. Raman Lidar personnel (Belay Demoz and
Dave Whiteman) providing
emergency support if needed. Bob Knuteson and Ralph Dedecker are
supporting the S-HIS and NAST-I
in OKC and can respond within six hours if AERI needs attendance.
--
=============================================================================
Wayne F. Feltz CIMSS/SSEC
Cooperative Institute for Meteorlogical Studies UW-Madison
Space Science and Engineering Center 1225 W. Dayton Rm 239
University of Wisconsin - Madison Madison, Wisconsin 53706
wayne.feltz@ssec.wisc.edu Tel: (608) 265-6283 Fax: (608) 262-5974
_______________________________________________
Ihop mailing list
Ihop@gi.ssec.wisc.edu
http://gi.ssec.wisc.edu/mailman/listinfo/ihop