-----------------------
AERI-bago Daily Summary
-----------------------
Date: 17 July 2002 (Sunday and Monday)
Location: Everglades City, Florida
Operator: Bob Holz
Weather Conditions:
Sunny this morning. Cumulous developed in the late morning.
2:00pm (local) rain and thunder began.
4:00pm partly sunny with haze and scattered cumulous.
Instrument Status:
AERI worked great all day except the LW and SW responsively went out of
limits while the hatch was closed. I am not sure what caused this. The
hatch worked all day with no problems.
Science:
Only the Proteus and the P3 flew today. The Proteus flight was at 11:45
- 16:45 (local).
Miscellaneous:
Any questions feel free to call or email:
AERI phone: 941 695 2113
e-mail: reholz@ssec.wisc.edu
Bob Holz
_______________________________________________
Crystal mailing list
Crystal@gi.ssec.wisc.edu
http://gi.ssec.wisc.edu/mailman/listinfo/crystal